Cargo hauler/Fifties schedule overlap

Here's where the general chat and organization of Group/Shared Builds takes place, with Guidelines, the GB/SB Calendar, and an Index to completed GBs.

Moderator: PaulBradley

Locked
User avatar
DavidWomby
Modelling Gent and Scholar
Posts: 11707
Joined: May 1st, 2011, 8:09 pm
Location: Florida, USA

Cargo hauler/Fifties schedule overlap

Post by DavidWomby »

Coming so fast after the Mbox GB, is there anybody else who might prefer these two GBs overlap a bit less on the schedule? I can see myself getting a bit stressed over those 3 GBs if I sign up to all three as currently scheduled.

Just asking.

David
User avatar
MarkyM607
Modelling Gent and Scholar
Posts: 9153
Joined: January 5th, 2013, 1:16 pm
Location: Cambs

Re: Cargo hauler/Fifties schedule overlap

Post by MarkyM607 »

Might be an idea. I'm also in the Zero GB so it could mean four or five GB's running together, at least at some point. Can adapt to this if needed though.
Hoping to return to modelling sometime this year!! :lol:
Owner of Marky's Model Emporium since 2013!.
User avatar
Dazzled
Modelling Gent and Scholar
Posts: 9592
Joined: October 1st, 2011, 11:08 pm
Location: Mid Glamorgan, South Wales
Contact:

Re: Cargo hauler/Fifties schedule overlap

Post by Dazzled »

It's an unfortunate feature of GBs that the ones we find appealling can overlap. Longer GBs would allow more potential for participation in these cases.
COLD WAR S.I.G. LEADER

Wherever there's danger, wherever there's trouble, wherever there's important work to be done....I'll be somewhere else building a model!
User avatar
Old_Tonto
Modelling Gent and Scholar
Posts: 8049
Joined: May 1st, 2011, 7:41 pm
Location: Middlesbrough, Peoples Republic of Teesside.

Re: Cargo hauler/Fifties schedule overlap

Post by Old_Tonto »

Sounds like some careful planning will be required if you are involved in multiple GB's at the same time.

The Matchbox GB should be over pretty quickly. I find those kits fall together.
2023 - A:0 B:0 C:0
Current Projects:
East German Air Force (1956-90)
South African Air Force (1958-93)
User avatar
JohnRatzenberger
Why is he so confused ?
Posts: 15708
Joined: April 5th, 2011, 3:42 pm
Location: Living on a sandbar - Nags Head, NC.

Re: Cargo hauler/Fifties schedule overlap

Post by JohnRatzenberger »

The new Guidelines are posted; they allow longer GBs amongst other things.

The FAQ notes that GBLs of already scheduled GBs can adapt them to the new Guidelines, if they wish.

The Guidelines also say the GBC (me) can allow deviations to handle exceptional circumstances such as might be caused by trying to expand or move already scheduled GBs.
John Ratzenberger :???:
It's my model and I'll do what I want with it.
Locked